Okay well I've been busy on my jacobs wind generator, trying to get it up asap. I've gone through the generator and cleaned/ replaced anything necessary. I'm fiberglassing the blades and getting pretty close. I've also installed the 3 leg 48' tower 1 piece at a time! That was a chore but now I have the 5' stub tower, blades, tail, etc to get up in the air.
I don't really have anyone willing to climb up and help, and I don't really enjoy it myself! I'd like to assemble everything on the stub tower and crane it up and bolt together, rather than try to install the individual parts in the air. I'm going to price out a crane but doubt I can afford it right now. Plus I keep thinking, what if there's a problem with the generator and I need to crane it down later?
Now I know that's alot of rambling but I was hoping to hear from anyone that has done this, or if you have creative ideas? I found where a member on here "Shadow" raised his Jacob with something similar but he did it one piece at a time. I've seen the straight pipe with a pulley and a hand winch, but wouldn't the Jake drag against the tower with no arm at the top to hold it away?
I've wondered about using 60' of tv tower next to my tower and basically build a mini crane at the top, but this seems overkill and I wasn't sure how much weight could hang off of those towers. Really wishing I had a tilting tower.....